Diamond Drill On-site at 007

Similar to our 1,000 tonne bulk sample at Trench 1 in 2017 (results here http://www.inventusmining.com/s/Inventus_Jan3.pdf), the first step in the next phase of bulk sampling at 007 is to strip and diamond drill the area on a 5x5 m grid. The drill arrived today and should be operational tomorrow. This will enable us to define exactly where the eventual bulk sample will be taken, and give us an indication of the gold grade.

September 27, 2018 at 007 Zone

September 27, 2018 at 007 Zone

Previous
Previous

Sudbury Prospectors and Developers Association Technical Talk by Wesley Whymark, Chief Geologist

Next
Next

Presentation Updated With A Few New Slides